Synergytech Engineering Services & Solutions Contact us

Solutions / PowerMore Hybrid BESS / Projects

PowerMore projects

Proven on real sites, in Qatar and worldwide.

How PowerMore hybrid battery systems have cut diesel, generator runtime and emissions on construction, industrial and event sites.

PowerMore hybrid battery energy storage unit

In Qatar · Doha industrial workshop

43% less diesel at a Doha workshop.

A PowerMore hybrid battery system was added to the diesel generator powering an industrial electrical and AC workshop in Doha. The workshop kept round-the-clock power while burning far less fuel.

43%less diesel
25 tCO₂ avoided a year
24/7reliable power
Senmarck and Synergytech hybrid battery seminar in Doha

Event · June 2024 · Hyatt Regency Oryx, Doha

Hybrid battery storage seminar with Senmarck Energy.

Senmarck Energy organised a seminar in Doha with its local partner Synergytech, Qatar Gas and other energy and service companies, introducing hybrid battery systems for engineering projects, temporary power and uninterrupted power supply.

Worldwide

Senmarck PowerMore projects around the world.

Results reported by Senmarck Energy from PowerMore installations. Savings on your site depend on your load profile. We start every project with a site assessment.

12 hybrid units, three years on a highway project

Construction · Highway · Guangzhou, China

12 hybrid units, three years on a highway project

Twelve PowerMore units with 350 kW generators as backup have powered piling machines, tower cranes, pumps and site facilities on the Zengtian highway project for nearly three years.

65%+lower energy costs
12PowerMore units
~3 yrsin continuous use

PowerMore 250 kW / 153 kWh × 12

Replacing 2,500 kVA of generators on tunnel works

Construction · Tunnelling · Guangzhou, China

Replacing 2,500 kVA of generators on tunnel works

Six air compressors (792 kW in total) ran on 2,500 kVA of diesel generators. Two synchronised PowerMore units and two 365 kW generators now share the load in parallel.

60%less generator runtime
45%lower energy costs
2,500 kVAof generators replaced

2 × PowerMore 250A (300 kWh) + 2 × 365 kW gensets

One generator removed, 500 litres a day saved

Construction · Singapore

One generator removed, 500 litres a day saved

The site ran two 400 kVA generators. With PowerMore covering surges of 3–4× the site's heavy machines, one 400 kVA generator was enough.

500 Ldiesel saved per day
625 kWcombined output
1 of 2generators removed

400 kVA genset + PowerMore 250 kW / 140 kWh

Tower cranes on a third of the diesel

Power rental · Tower cranes · Singapore

Tower cranes on a third of the diesel

A power rental company paired PowerMore with the generators running its tower cranes on high-rise sites, cutting daily generator runtime from 12–16 hours to 3–4 hours.

70%less diesel
3–4 hgenerator runtime a day
9 monthsreported payback

Hybrid diesel + PowerMore BESS

A 300 kVA generator replaces up to 800 kVA

Construction · Highway · Guangzhou, China

A 300 kVA generator replaces up to 800 kVA

Pile drivers, concrete mixers and site offices used to need 600–800 kVA of generators. A 300 kVA generator with PowerMore now powers the site.

54%less fuel
65%fewer operating hours
300 kVAinstead of 600–800 kVA

300 kVA genset + PowerMore 250 kW / 140 kWh

A concrete plant cuts diesel by more than three quarters

Concrete batching · Vietnam

A concrete plant cuts diesel by more than three quarters

A ready-mix plant ran a 400 kVA generator around the clock for mixers, conveyors and dust collectors. The battery now carries the load and a smaller generator recharges it for about 3 hours a day.

78%less diesel
1,800 → 400 Ldiesel per day
82 tCO₂ avoided a year

PowerMore 250A + 100 kVA genset

300 kW of motor load from a downsized generator

Construction · Drilling · Shanghai, China

300 kW of motor load from a downsized generator

A drilling project met more than 300 kW of inductive load with one downsized 360 kW generator. Most of the day, the power comes from the battery.

60%+lower power costs
300 kW+inductive load
360 kWdownsized generator

PowerMore PDE250 (250 kW / 153 kWh)

Eight pile drivers on one hybrid system

Construction · Piling · China

Eight pile drivers on one hybrid system

A road construction site powered eight 70 kW pile drivers with a PowerMore hybrid system.

41%fuel costs saved
8pile drivers
250 kWpower converter

PowerMore HDE600 (250 kW / 150 kWh)

Quiet, clean power for a park event

Events · Shenzhen, China

Quiet, clean power for a park event

A PowerMore unit powered a park event, with the diesel generator kept only as an automatic backup.

89%less CO₂
153 kWhbattery capacity
Silentbattery operation

PowerMore 250A + backup genset

A 2.2 MW hybrid system for a whole quarry

Quarry · Jiangxi, China

A 2.2 MW hybrid system for a whole quarry

A custom system gives an off-grid quarry peak power boost and saves 1,500 kW of generator capacity.

1,500 kWgenerator capacity saved
2.5 MWhenergy storage
16 monthsestimated payback

2.2 MW converters + 2.5 MWh + 1,200 kW gensets

Could your site be next?

Send us your generator sizes and site loads. We'll assess your load profile and show you the likely savings.