Synergytech Engineering Services & Solutions Contact us

Solutions / Hybrid power / PowerMore Hybrid BESS

Product · PowerMore Hybrid BESS

Cut diesel costs. Keep every site powered.

Add a battery energy storage system to the generators you already run. The battery takes the low loads, peaks and surges, so the generator only works where it is efficient.

Supplied, installed and supported by Synergytech, authorised distributor of Senmarck Energy in Qatar

PowerMore PDE250 hybrid battery energy storage unit
Up to 90%fuel savings*, depending on load profile
350 L/daysaved on a 500 kVA unit: 1,000 to 650 L/day
3–4 yrstypical project ROI horizon
600+energy storage projects delivered globally

How it works

Your generator, plus a battery that does the hard part.

The energy management system decides when the genset runs. Surplus generator power recharges the battery, and once the battery is 60–70% charged the generator switches off automatically.

Your existing asset

Diesel generator

Keeps running, but near its efficient 75% load instead of idling at low load.

The add-on

PowerMore hybrid BESS

Covers low loads, peaks and sudden surges. The EMS controls the genset fleet.

The result

Stable site power

Tower cranes, hoists, site offices and heavy motors, with fewer voltage drops and less fuel.

Smart energy management

How the EMS runs your generator.

The energy management system reads the generator controller and decides, second by second, whether the battery, the generator or both supply the site.

01 · Efficient running

Generator at 75–80% load

When the generator runs, it is held near its most efficient load. Surplus power charges the battery.

02 · Battery mode

Generator switches off

Once the battery is 60–70% charged, the EMS shuts the generator down and the battery powers the site quietly.

03 · Recharge

Automatic restart

When the battery runs low, the generator starts again, powers the load and recharges the battery.

04 · Peak loads

Both in parallel

For crane lifts and motor starts, battery and generator supply power together, with no interruption.

Work modes

Generator priorityBattery priorityGrid priority with battery backupRemote monitoring, notifications and email alarms

What Synergytech does

We don't just supply the battery. We put it to work.

From the first load study to day-to-day support, our team in Doha and Ras Laffan handles the whole job.

01

Site assessment

We study your load profile and generator fleet.

02

Sizing

We match the battery and genset to your peaks.

03

Supply

Genuine Senmarck equipment, delivered in Qatar.

04

Installation

Our team connects it to your generators on site.

05

Commissioning

EMS set-up, testing and handover.

06

Support

Remote monitoring, maintenance and reporting.

The range

Four sizes, from 65 kW to 500 kW.

Each PowerMore model comes with a choice of battery capacity. We size the system to your generators and site loads.

PowerMore PDE65 hybrid battery unit

PowerMore-PDE65

65 kW

69.1 or 138.2 kWh

PowerMore PDE130 hybrid battery unit

PowerMore-PDE130

130 kW

69.1, 138.2 or 276.4 kWh

PowerMore PDE250 hybrid battery unit

PowerMore-PDE250

250 kW

138.2, 276.4 or 552.8 kWh

PowerMore PDE500 hybrid battery unit

PowerMore-PDE500

500 kW

276.4, 552.8 or 1,105.6 kWh

PowerMore containerised battery systems ready for dispatch
PowerMore containerised units: plug and play, built for lifting and transport between sites.

Specifications

PowerMore 250 series in detail.

An all-in-one LFP battery system for heavy-duty, off-grid use. It works with diesel generators, the grid or solar, and runs in parallel with your gensets. It can be expanded to 4 MW for large projects.

  • 2–4× overload capability200% for 3 minutes handles crane and hoist motor starts
  • Peak power boost100 kW genset + 100 kW BESS = 200 kW at peak
  • Smart EMSAuto start/stop, peak shaving, genset synchronisation
  • Remote monitoringLive and historic data from a tablet or PC, 24/7
  • Solar readyConnects to PV with no infrastructure changes
  • Site-tough buildIP54 container, alarms and fire suppression
ModelPDE250APDE250B
Rated power250 kW250 kW
Energy storage153 kWh307 kWh
AC voltage380–440 V, 50 Hz380–440 V, 50 Hz
Battery voltage600–876 V DC600–876 V DC
Max. current450 A600 A
Chemistry · ratingLFP · IP54LFP · IP54
InputsGrid, solar, diesel generator

PDE250A and PDE250B are the standard 250 kW configurations. Other battery capacities from the range above, and datasheets for every model, are available on request.

Generator compatibility

  • Works with existing diesel or gas generators from 50 to 800 kVA
  • Tested with DeepSea controllers, from the DSE335 to the DSE8680 (Modbus)
  • Scales from 100 kWh to 2.5 MWh by running units in parallel
  • Batteries rated for −30 °C to 50 °C

Find out what PowerMore would save on your site.

Send us your generator sizes and running hours. We will size the system and estimate your fuel savings.

Where it works

Built for heavy motor loads and off-grid sites.

PowerMore is designed for equipment with high starting currents and changing loads, where generators are usually oversized.

Tower cranes

Absorbs lift surges so the generator can run less.

Piling and drilling rigs

Handles pile drivers and drilling motors on one hybrid system.

Tunnelling and compressors

Air compressors and pumps on smaller, synchronised generators.

Concrete batching plants

Mixers, conveyors and dust collectors without 24/7 generator running.

Quarries and crushers

Peak power boost for crushers on remote sites.

Events and temporary power

Quiet battery power, with the generator as automatic backup.

Mining and remote sites

Less fuel to deliver to sites that are hard to reach.

Oil & gas and plants

More efficient gensets for workshops and plant support.

Applications

One hybrid system, three ways to use it.

We assess your site loads, size the system, install and commission it, and support it in operation from Doha and Ras Laffan.

For EPC contractors

Hybrid power for construction sites

Generators on site are often oversized by 60–300% just to cover start-up surges. PowerMore lets you run a smaller genset and cuts generator fuel use by up to 90% in hybridisation mode.

  • Smaller generators, same peak capacity
  • Quieter for city and noise-sensitive sites
  • No wet stacking, longer engine life

For rental operators

Make every generator in your fleet earn more

Pair BESS with the generators that power your rental equipment, HVAC included. Burn less diesel, serve customers better and right-size your fleet.

  • Hybrid rental packages
  • Fuel optimisation contracts
  • Lower engine hours on assets you own

Energy-as-a-Service

Stop renting generator hours. Start selling energy.

With a generator, a battery and a smart controller, customers pay for energy availability and performance, not equipment. You move from a rental fee to recurring revenue.

  • Reliable, guaranteed performance
  • Remote monitoring and energy analytics
  • Long-term service agreements
PowerMore hybrid battery energy storage unit

Case study · Doha, Qatar

Hybrid battery system cuts fuel and CO₂ at a Doha workshop.

A PowerMore hybrid BESS was added to the diesel generator powering an industrial electrical and AC workshop in Doha, replacing generator-only operation with a smart hybrid set-up. The workshop kept round-the-clock power while burning far less fuel.

43%less diesel
25 tCO₂ avoided a year
24/7reliable power

Projects worldwide

Proven on construction, industrial and event sites.

Results reported by Senmarck Energy from PowerMore installations.

65%+

Highway project, Guangzhou

12 units, nearly three years of continuous use.

70%

Tower cranes, Singapore

Generator runtime down from 12–16 to 3–4 hours a day.

78%

Concrete plant, Vietnam

Diesel down from 1,800 to 400 litres a day.

See all projects →

Ready to cut your diesel bill?

Ask for a quotation, a datasheet or a site visit from our Doha team.

Questions

Frequently asked questions.

What is a hybrid BESS?

A battery energy storage system that works alongside your diesel generator. A control system decides when to charge or discharge the battery, so the generator runs less and only at its efficient load.

Will it work with the generators I already have?

Yes, in most cases. PowerMore works with existing diesel or gas generators from 50 to 800 kVA and has been tested with common DeepSea controllers. We check your generators during the site assessment.

How much fuel will I save?

It depends on your load profile. Savings can reach up to 90%. For example, a 500 kVA unit can drop from 1,000 to 650 litres a day. We measure your loads first and give you an estimate for your site.

What happens when the battery runs low?

The EMS starts the generator automatically. It powers the site and recharges the battery, then switches off again. Power is not interrupted.

Can it use solar or grid power?

Yes. PowerMore accepts grid, solar and diesel generator inputs, and can run in grid-priority mode with the battery as backup.

What does Synergytech do on site?

We assess your site, size the system, supply the equipment, install and commission it, and support it afterwards with remote monitoring and maintenance from Doha and Ras Laffan.

The future of power rental

From equipment hire to managed energy.

Start with one site. Prove the savings. Scale the model: pilot, measure, contract, scale.

Yesterday

Diesel generator

Equipment rental · CapEx mindset

Today

Generator + monitoring

Managed power · Operational support

Tomorrow

Generator + hybrid BESS + EMS

Energy-as-a-Service · Long-term partnership

Hybrid rental packagesFuel optimisation contractsRemote monitoringEnergy analyticsLong-term service agreements
PowerMore battery systems running on a construction site

Start your next project with BESS.

Ask Synergytech, authorised distributor of Senmarck Energy in Qatar, for a site assessment. We'll look at your load profile and show you the likely savings.